Title:
Re-design of Waste Water Treatment Plant
Duration:
18/11/2020 – 18/01/2021
VIDA Challenge:
Sustainable Breweries
Summary:
Enable the brewery to be able to treat their wastewater to a level where it can lead to a recipient instead of being treated as a wastewater plant. This project entails the calculation of the present and future demand of the treatment capacity and evaluates how WWTP can be re-designed to match their needs.