Site icon VIDA

Re-design of Waste Water Treatment Plant

Title:

Re-design of Waste Water Treatment Plant

 

Duration:

18/11/2020 – 18/01/2021

 

VIDA Challenge:

Sustainable Breweries

Summary:

Enable the brewery to be able to treat their wastewater to a level where it can lead to a recipient instead of being treated as a wastewater plant. This project entails the calculation of the present and future demand of the treatment capacity and evaluates how WWTP can be re-designed to match their needs.

Partners

Exit mobile version